Feasibility Study Report

Feasibility Study Report of BORLEY Copper Leaching Plant with a Capacity of 3000 tons per year:

The FS report includes results of geological and exploration studies as well as mine design and optimization studies, market studies, infrastructure studies, processing studies and reviewing the required permits and other operational conditions of the project. Also, it represents an economic evaluation of the present project in the Kazakhstan as the investment environment of this project.

The study was ordered by Kavand Nahan Zamin Co. to be performed by Kusha Madan Consulting Engineers Co.